St Lukes Switchgear replacement
"Replacement and upgrade of Existing Primary LV Switchgear currently serving the entire campus - Replacement of the Existing Generator Plant, Oil Storage Tank and assoc. Mains Cabling. - Change-over of existing mains cabling from existing LV Panels to New Main Switchgear Equipment - De-energise + Re-energise of power to campus buildings to allow mains cable change-overs. - Required out of hours works and phasing to accommodate power downs and cable changeovers. - Attendance to each building after power down and change-over to ensure normal operation. - Demolition of an existing storeroom and construction of 2 new ‘small’ storerooms. - Demolition and rebuild of an existing boundary wall of approximately 25 linear meters. - External cabling trenching, plinths and other general builders works associated with the above works."
Details
- Abgabefrist
- 22. Apr. 2026
- Land
- IE
- Geschätzter Auftragswert
- €0
- CPV-Codes
- 45000000
Demo buchen.
Sehen Sie, was BOND für Ihr Unternehmen findet — Ausschreibungen, Lieferanten und Partner, die Sie allein nie entdecken würden. Monatlich kündbar, jederzeit.